Data Center Decommissioning
Full-lifecycle facility decommissioning: live-site isolation, mechanical and electrical extraction, asset recovery, and certified compliance across the UK and Europe.
Our Decommissioning Process
Structured, safety-first execution engineered for mission-critical facilities and complex live electrical infrastructures.
- Comprehensive site survey & risk review
- Asset & equipment inventory verification
- Engineering-led project scoping & timelines
- Critical power & electrical isolation
- Certified HV lockout / tagout (LOTO) protocols
- Environmental zoning & safety barrier control
- Systematic removal of switchgear & transformers
- UPS modules, generators & CRAC decommissioning
- Structured cabling & raised floor extraction
- Certified on-site data & media destruction
- Environmental recycling & WEEE documentation
- Final clean sweep & handover certification
Services in Detail
Specialized industrial decommissioning, plant extraction, and hazardous asset recycling engineered for mission-critical facilities across the United Kingdom.
Complete decommissioning and turnkey architectural strip-out of data centers, substations, and mission-critical power environments.
Safe electrical isolation, rigging, and decommissioning of high-voltage switchgear, transformer units, and uninterrupted power supply banks.
Turnkey removal, crane extraction, and transportation of multi-megawatt diesel and gas backup generator systems from any site configuration.
Removal of pedestal flooring, cable trays, overhead containment systems, and heavy structural steel mezzanine platforms.
Compliant on-site or off-site sanitization, physical shredding, and certified destruction of storage media with chain-of-custody documentation.
Environmentally responsible recovery, hazardous material handling, and certified WEEE-compliant recycling for obsolete power infrastructure.
Compliance & Safety
Zero-incident safety record
Strict adherence to British and international high-voltage isolation standards.
CDM compliance certified
Fully insured, CDM 2015 compliant on every project across all site tiers.
Certified high-voltage technicians
100% in-house, certified specialists with zero subcontractor handoffs.
Full chain-of-custody documentation
Complete data destruction certificates and verifiable environmental compliance records.
Let's walk your site and get you a hard number
Direct decommission and power equipment valuations across the UK. Fast turnaround, transparent asset recovery pricing, and zero obligation.