Completed decommissioning projects
See how we safely recover high-voltage electrical assets and decommission critical facilities across the UK and Europe.

Lloyds Data Centre, Pudsey Leeds, UK, 8MW Site
Complete removal of entire 8MW facility, which included four data halls, 100,000 sm2 of data center flooring, and 8MW of power infrastructure. Resold and relocated all assets and installed in South Africa

Kyndryl/IBM , Kishta Sweeden, 12MW Site
Decommissioned 13 2MW diesel generators, including 6 data halls, a total of 120,000 m2 back to shell. Resold and relocated all assets and installed in South Africa

Digital Reality Sites 1 & 2 10MW SITES COMBINED.
IMMEDIATE deplayment and mobilization on site afeter sites underwent security breach. Deployed security within 24hours, removed tresspasers, completed full decom of both sites within three months and returned value back back to the client.

TATA Communications, 110 m2 Data Center Strip our back to shell.
Fast-track asset reclamation of live backup generators and dual-bus power distribution units.

Kyndryl, Subterrain Data Centre removal.
Turnkey decommissioning of legacy rectifier systems, Data centre was located on subterrain floors 2, 3 and 4. Indistrial rigging required. Assets relocated and reinstalled in Egypt.

Reading Technology Park Grid Exit
Full structural extraction of 8 Cummins industrial generators and associated fuel storage modules.