Proven Execution

Completed decommissioning projects 

See how we safely recover high-voltage electrical assets and decommission critical facilities across the UK and Europe.

Industrial UPS room decommissioning in London Docklands
8MW DATA CENTRE
PUDSEY,LEEDS, UK

Lloyds Data Centre, Pudsey Leeds, UK, 8MW Site

Complete removal of entire 8MW facility, which included four data halls, 100,000 sm2 of data center flooring, and 8MW of power infrastructure. Resold and relocated all assets and installed in South Africa

Value1.1M
DurationFour Months
Safety0 Incidents
Heavy Caterpillar industrial generator removal in Slough facility
12MW DATA CENTRE
KISHTA SWEDEN

Kyndryl/IBM , Kishta Sweeden, 12MW Site

Decommissioned 13 2MW diesel generators, including 6 data halls, a total of 120,000 m2 back to shell. Resold and relocated all assets and installed in South Africa

Value860,000
DurationFive Months
Safety0 Incidents
High-voltage electrical switchgear decommissioning site
FULL DECOMMISSIONING - BACK TO SHELL
SURREY, UK

Digital Reality Sites 1 & 2 10MW SITES COMBINED.

IMMEDIATE deplayment and mobilization on site afeter sites underwent security breach. Deployed security within 24hours, removed tresspasers, completed full decom of both sites within three months and returned value back back to the client.

Value450,000
DurationThree Months
Safety0 Incidents
Data center raised floor and power distribution unit removal
Enterprise Banking
STRATFORD, LONDON, UK

TATA Communications, 110 m2 Data Center Strip our back to shell.

Fast-track asset reclamation of live backup generators and dual-bus power distribution units.

Value250,000
DurationFour Months
Safety0 Incidents
Telecom generator room extraction and asset clearance
Telecom Exchange
HELSINKI, FINLAND

Kyndryl, Subterrain Data Centre removal.

Turnkey decommissioning of legacy rectifier systems, Data centre was located on subterrain floors 2, 3 and 4. Indistrial rigging required. Assets relocated and reinstalled in Egypt.

Value£600K
DurationThree Months
Safety0 Incidents
Industrial diesel generator rig extraction at technology park
Co-Location Facility
Reading, Berkshire

Reading Technology Park Grid Exit

Full structural extraction of 8 Cummins industrial generators and associated fuel storage modules.

Value£3.2M
Duration10 Weeks
Safety0 Incidents